Installation and configuration
Putting a three-phase UPS in is an electrical project, not a delivery. Here is how the work runs and what we need before quoting it.

We confirm the real load, the feed available, and where the system can physically go.
Upstream protection, cable sizing and the bypass arrangement are settled before anything is ordered.
Access route, floor loading and clearances are checked against the cabinet before it arrives.
The system is wired in, then settings, alarm thresholds and any network card are configured.
The system is verified under load and the configuration is documented for the people who will run it.
Large three-phase projects follow these steps, as for high-capacity three-phase UPS in mission-critical sites. Smaller single-phase and rack-mount systems can be installed through UPS installation and consulting service.