EN · FR
GE  ›  SitePro

GE · SitePro

GE SitePro three-phase UPS

Specifying or deploying a GE SitePro? We size it to your load and redundancy, supply it, install and commission it, and maintain it for life.

GE SitePro three-phase UPS
Rating
8 to 450 kVA/kW
Phase
3PH
Models
16
Lifecycle
Discontinued, serviced

Overview

The GE SitePro is a three-phase UPS series for critical loads, data centres, healthcare, industrial and infrastructure. We specify the right configuration from the SitePro line, supply it, and install it turnkey across Canada. We carry every major brand, so we can compare the SitePro against the alternatives on price, footprint and lead time.

THREE PHASE POWER PATH3 PHASE INPUT480 V or 208 V feedRECTIFIERAC to DCDC BUSregulatedINVERTERDC to clean ACCRITICAL LOADracks, plant, imagingBATTERYon the DC busSTATIC BYPASSmaintenance and overload pathDouble conversion: the load stays on the inverter,so an outage produces no transfer gap.

How a three phase double conversion UPS carries the load, and where the bypass sits.

SitePro models

The orderable configurations we supply and service:

ModelRatingPhase / VoltagePart numberStatus
GE Digital Energy SitePro (10-500kVA family)8 kW3ph+N in/out 380/400/415Vac·EOL
GE Digital Energy SitePro 10 kVA9 kW3ph+N in/out 380/400/415Vac·EOL
GE Digital Energy SitePro 15 kVA13 kW3ph+N in/out 380/400/415Vac·EOL
GE Digital Energy SitePro 20 kVA18 kW3ph+N in/out 380/400/415Vac·EOL
GE Digital Energy SitePro 30 kVA27 kW3ph+N in/out 380/400/415Vac·EOL
GE Digital Energy SitePro 40 kVA36 kW3ph+N in/out 380/400/415Vac·EOL
GE Digital Energy SitePro 60 kVA54 kW3ph+N in/out 380/400/415Vac·EOL
GE Digital Energy SitePro 80 kVA72 kW3ph+N in/out 380/400/415Vac·EOL
GE Digital Energy SitePro 100 kVA90 kW3ph+N in/out 380/400/415Vac·EOL
GE Digital Energy SitePro 120 kVA108 kW3ph+N in/out 380/400/415Vac·EOL
GE Digital Energy SitePro 150 kVA135 kW3ph+N in/out 380/400/415Vac·EOL
GE Digital Energy SitePro 200 kVA180 kW3ph+N in/out 380/400/415Vac·EOL
GE Digital Energy SitePro 250 kVA225 kW3ph+N in/out 380/400/415Vac·EOL
GE Digital Energy SitePro 300 kVA270 kW3ph+N in/out 380/400/415Vac·EOL
GE Digital Energy SitePro 400 kVA360 kW3ph+N in/out 380/400/415Vac·EOL
GE Digital Energy SitePro 500 kVA450 kW3ph+N in/out 380/400/415Vac·EOL

Specifications

Phase3ph+N in/out
Voltage380/400/415Vac
Models16
StatusDiscontinued

Sizing, redundancy and custom builds

We engineer the solution: load and growth analysis, redundancy (N, N+1, 2N), runtime and battery sizing, paralleling and switchgear, and custom configurations where the standard catalogue doesn't fit. Because we supply every major brand, the SitePro is one option we weigh on its merits, not the only answer.

Supply, install and lifecycle

We deliver, install and commission the system on site (coordinated with your electrical contractor), then keep it running with preventive maintenance, battery replacement and emergency support, including SitePro units that are out of warranty or discontinued by the manufacturer.

Planned visits and emergency calls are arranged through on-site service for the SitePro. A worn string in the SitePro can be rebuilt from the UPS battery block catalogue.

Common questions

Can you replace an old or discontinued unit with a different brand?

Yes, that's most of what we do. Send the model and part number you have (any brand, even end-of-life) and we cross-reference an equivalent that matches the load and footprint. If the original is back-ordered, we propose an in-stock unit that ships sooner.

Do you replace just the batteries, or the whole UPS?

Whichever is the better value. A battery replacement (sometimes with an added cabinet for more runtime) often restores full protection at a fraction of a new system. We need your exact model and variant to quote it accurately.

What are the lead times?

It depends on the model and stock. When the original has a long lead time, we usually propose an equivalent we can ship sooner so the load isn't left exposed. Tell us your timeline in the quote.

Do you install it, and across Canada?

Yes, we supply, install and commission the system anywhere in Canada, coordinated with your electrician, and maintain it afterward: preventive maintenance, batteries, emergency support and remote monitoring, on a single unit or a multi-site fleet.

Can you quote a complete system, not just the UPS?

Yes, UPS, power distribution, racks, batteries and the installation in one quote, coordinated with your electrical contractor.

Request a quote: GE SitePro

Tell us the application and we reply within 4 business hours with the sizing, the right system, the installation and a written quote. Three-phase installs usually need a licensed electrician, so let us know if you have one.

Do you have your own electrician?
Yearly preventive maintenance?

Or email info@threephaseups.ca · 1 (438) 881-3363

Brand names are trademarks of their owners and are used only to identify the equipment we service. We are not the manufacturer and are not affiliated with it.