Built-in UPS battery tests and runtime calibration

Most three-phase UPS can test their own batteries. A short battery test (about 10% of runtime on a Galaxy VS) catches blown fuses and weak blocks; a runtime calibration discharges to the low-battery warning to correct the runtime estimate; and on some models a SPoT mode test discharges the batteries at a set power without a load bank. Each one spends battery life, so schedule them on purpose.

Row of sealed batteries on a metal rack, wired in a string

Key facts

Three tests, three different questions

TestWhat it doesWhat it proves
Battery testShort discharge, about 10% of total runtime capacity (Galaxy VS)No blown fuse, no weak block
Runtime calibrationTransfers to battery and discharges to the low DC warning levelThe real capacity, so the runtime estimate is corrected
Battery SPoT mode (Galaxy VL)Discharge at an output power set from 0 to 100%, without a load bankRuntime at your operating load

None of them replaces a full load-bank test of the power train; they answer the battery question only.

Battery test: frequent and light

On the Galaxy VS, the battery test checks for blown fuses and weak batteries and uses about 10% of the runtime. It needs the batteries above 50% charged and more than 4 minutes of runtime available, and it can be scheduled from weekly to once a year. If the utility drops or a critical alarm appears, the test aborts and the UPS returns to normal operation.

Eaton's 93PM works the same idea into its charger: Advanced Battery Management keeps the batteries charged and tests them periodically by transferring to battery mode while monitoring voltage, with a series of tests 24 hours into the float period.

Runtime calibration: deep and occasional

Calibration discharges the batteries to the low DC warning level and uses the elapsed time and load to recalculate capacity. Schneider recommends it at start-up, when batteries are replaced, and when the battery solution changes. The load must be at least 10% and must not move more than 20% during the test.

The cost is real: during calibration the batteries are too low to carry the load through an outage, runtime stays short until recharge, and repeated testing or calibration can affect battery service life. Run it in a quiet period with the generator available.

SPoT mode: a discharge test without a load bank

The Galaxy VL manual describes Battery SPoT mode, which performs a battery discharge test without the need for a load bank, at an output power you set between 0 and 100%. The load is not supported by the UPS during the test, so it is run with the load shut down or on an alternative supply, and the feature has to be enabled by Schneider Electric services during start-up.

Turning results into a plan

A failed battery test or a calibration that shows less runtime than designed is the trigger to measure each block and plan the string. Compare the measured runtime with your target using a UPS runtime calculator, then book the work with a crew that replaces three-phase battery strings on site. Battery age is the other half of the answer; see how long three-phase UPS batteries last.

Related pages

Common questions

How much battery does a Galaxy VS battery test use?

About 10% of the total runtime capacity. With 10 minutes of runtime, the test runs for about 1 minute.

When should a runtime calibration be done?

Schneider recommends it at start-up, when batteries are replaced, and when the battery solution changes.

Is a runtime calibration risky?

During the test the batteries are discharged to the low DC warning level and cannot carry the load through an outage, and repeated calibrations can affect battery life.

Can a UPS test its batteries without a load bank?

The Galaxy VL Battery SPoT mode does a discharge test without a load bank, at an output power you set, but the UPS does not support the load during the test.

Does the Eaton 93PM test its own batteries?

Yes. Advanced Battery Management tests the batteries periodically by transferring to battery mode and monitoring voltage, including a series of tests 24 hours into the float period.

Sources, checked October 4, 2026:

Send us the details

Fill this in and your own mail client opens with everything already written out. Nothing is sent from this site.

Or write to us directly at info@threephaseups.ca · 1 (438) 881-3363

Brand names are trademarks of their owners and are used only to identify the equipment we service. We are not the manufacturer and are not affiliated with it.